Heavy-Duty Industrial Brackish Water RO Plant – 250 m³/day

250 m³/day heavy-duty industrial brackish water RO plant for large Oman factories and resorts. DuPont Filmtec 8040 membranes, multi-train PLC automation, CIP system. UV Water Systems, Muscat.

Description

006 | UV Water Systems Oman

At 250 m³/day (65,000+ GPD), a brackish water RO plant crosses into small-scale water utility territory. This capacity serves Oman’s largest hotels (200+ rooms), major industrial facilities, hospital complexes, township water supply, and large food manufacturing operations. UV Water Systems Muscat designs these as multi-train configurations — typically 2–3 parallel RO trains — enabling staged production and maintenance without interrupting supply.

Why This Matters for Oman Water Quality

At this scale, single-train failure means 250 m³/day of lost production — potentially halting a hotel kitchen, hospital laundry, or industrial process. UV Water Systems mitigates this through 2 × 125 m³/day or 3 × 85 m³/day configurations with independent controls and a common pre-treatment header. Pre-treatment for Oman’s brackish groundwater at this scale includes: inlet strainer, multimedia filter, activated carbon filter, 5-micron cartridge bank, antiscalant dosing with level sensor, and optional softener for high-hardness feeds.

Technical Specifications

  • Capacity: 250 m³/day (~66,000 GPD) at 25°C, multi-train
  • Feed TDS: Up to 5,000 mg/L
  • Membranes: Multiple DuPont Filmtec BW30-8040 in FRP 8-inch vessels
  • Pumps: Grundfos CRN per train, VFD option
  • Controls: PLC with SCADA, remote monitoring, auto-flush & CIP
  • Pre-Treatment: Full train: MMF, GAC, cartridge, antiscalant
  • Electrical: 380V/3-phase/50Hz, ~15–20 kW total installed
  • Piping: Schedule 80 UPVC or 316L SS on high-pressure sections
  • Standard: Designed to Oman / GCC industry requirements
  • Quality: ISO 9001:2015 certified supply chain — UV Water Systems, Muscat

Applications in Muscat & Oman

Oman’s largest hotels, major industrial facilities, township water supply, hospital complexes, and large-scale food manufacturing. UV Water Systems has delivered large RO projects for OQ, Royal Flight, and Oman Investment Authority.

Frequently Asked Questions

How long does a 250 m³/day project take from order to commissioning? Typically 8–14 weeks: 2 weeks design and engineering, 4–6 weeks fabrication and procurement, 2–4 weeks installation and commissioning. UV Water Systems provides a detailed project schedule at proposal stage. Call +968 9763 7786.

Can you provide performance bonds for tendered projects? Yes — UV Water Systems is registered with the Oman Tender Board. Discuss performance and warranty bond requirements with our team at +968 9763 7786 or email sales@waterfilteroman.com.

Do you deliver and install across Oman? Yes — UV Water Systems covers all Muscat governorate areas and ships products and spare parts to all wilayats in Oman. Call +968 9763 7786 or email sales@waterfilteroman.com.


UV Water Systems is an ISO 9001:2015 certified water treatment company based in Muscat, Sultanate of Oman, with 14+ years of experience. We supply, install, and service complete water treatment solutions for residential, commercial, and industrial clients across Oman. Call +968 9763 7786 or visit www.uvwater.biz.

Reviews

There are no reviews yet.

Be the first to review “Heavy-Duty Industrial Brackish Water RO Plant – 250 m³/day”

Your email address will not be published. Required fields are marked *